| Initiative |
Quantifiable Benefit To Date |
Percent Complete |
| South Runway Expansion Project |
|
| Relocate trees |
893 relocated trees that will preserves mature canopy for shade and air purification |
85 |
| Recycle pavement |
1,095 less dump trucks hauling material to the site (each truck holds 30 cubic yards) |
73 |
| Reduce emissions by reducing truck trips transporting fill material to site (accomplish by transporting via rail or reducing quantity required by at least 25%) |
21,066 less dump trucks hauling material to the site |
37 |
| Erosion control measures implemented during construction |
696 tons of soil prevented from entering waterways at 7.2 to over 1,000 tons/acre/year for construction activities |
88 |
| Install taxiway edge Light Emitting Diode (LED) lamps replacing incandescent lamps |
0 KWH: Total Energy Consumption Reduction per Year |
0 |
| Install MSE Wall LED lights |
0 KWH: Total Energy Consumption Reduction per Year |
0 |
| Install runway guard LED lights |
0 KWH: Total Energy Consumption Reduction per Year |
0 |
| Install windcones LED lights |
0 KWH: Total Energy Consumption Reduction per Year |
0 |
| Solar power LED flashers on barricades |
174 6-volt Batteries Not Needed per Month |
57 |
| Room in runway structures for a bike lane along Perimeter Road and US 1 |
Allows for safe travel by bicycles as an alternative to vehicular travel |
0 |
| Install solar powered cameras |
1,226 KWH: Total Energy Consumption Reduction per Year |
100 |
| West Lake Park Wetland Mitigation |
|
| Erosion control along the shore banks |
.9 miles of erosion control measures for long term reduction in soil entering waterways |
100 |
| Temporary essential habitat protection |
38 tons of soil prevented from entering waterways at 7.2 to over 1,000 tons/acre/year for construction activities |
100 |
| Invasive plant species removed |
15.9 acres of seed source reduction for the spread of invasives |
100 |