Story 1 Pile caps being formed at the southwest corner of the Tower’s building footprint.
|
Story 2 Concrete is poured to form pile caps on the west side of the building’s footprint.
|
|
Story 3 Columns poured by the west side of the building’s footprint.
|
Story 4 Piles formed at the south side of the Tower along 6th Street.
|
|
Story 5
In late January, the cranes were installed and work on the foundations was started.
|
|
|
|
|
|
|
|
|
|