• Constructing the required steel reinforcing for the new concrete piles.
    Constructing the required steel reinforcing for the new concrete piles.
  • Steel reinforcing dropped into a drilled auger pile location.
    Steel reinforcing dropped into a drilled auger pile location.
  • The cleared 1,000-Car Garage site with the historic Coca-Cola building in the upper right corner.
    The cleared 1,000-Car Garage site with the historic Coca-Cola building in the upper right corner.
  • View of Bell Tower area.
    View of Bell Tower area.
  • Underground utilities uncovered during street excavation.
    ​Underground utilities uncovered during street excavation.
  • New sewer lines under construction on Andrews Avenue.
    ​New sewer lineView of Bell Tower area.s under construction on Andrews Avenue.
  • View of Bell Tower area.
    ​View of Bell Tower area.
  • Clearing of the site is finished.
    Clearing of the site is finished.
  • Underground work begins.

     Underground work begins.

  • Preparing the site for the installation of concrete test piles.
    ​Preparing the site for the installation of concrete test piles.